← Permit Pack by Evergreen Fab NW

Free guide · King County, WA

Your first 30 days with a WA food trailer: King County

Last checked Nov 2026 against the official L&I, Public Health – Seattle & King County, Department of Revenue, and City of Seattle pages linked below.

Straight answer first: you will not be open in 30 days. L&I says plan review "can take several months" (L&I). Public Health says an initial plan review "may take up to 8 to 10 weeks" (King County).

What you can do in 30 days is get every application in, in the right order, so those clocks start now and don't restart later.

Days 1–3: Find out what you actually bought

Walk around the trailer and look for the L&I insignia. L&I tells buyers to make sure a unit "is inspected and approved for use in Washington, and has our insignia attached" (L&I).

The tag lists the approved plan number, the electrical service (amps/volts), the number of plumbing fixtures, and whether the unit was plan exempt. Take a clear photo. Public Health asks for a photo of the L&I sticker with your application (King County).

Two things that catch new owners:

Week 1: State business license and UBI

File a Washington Business License Application with the Department of Revenue. You need one if, among other things, you collect sales tax, use a name other than your legal name, plan to hire within 90 days, or gross $12,000 a year or more (DOR).

Also start your food worker cards now. Every employee of a food business needs a Washington food worker card. It's $10, and you can take the class and test online (King County).

Week 1–2: L&I insignia (plans or inspection only)

This is usually where it stalls, so start it early. Public Health will not approve your pre-operational inspection and permit until L&I has approved the truck or trailer. You can submit the county application before L&I approval, though (Seattle OED).

Do you need to submit plans to L&I?

You need plans approved before inspection if you have any of these (L&I):

No to all

Inspection only. Fill out form F623-040-000 and include $55.10 for the insignia. Mail it to L&I or take it to a local L&I office. L&I emails you an inspection request form once it's processed (L&I).

Yes to any

Plan review, then inspection. Download the plan review packet, read the Vendor Plan Review Submittal Guidelines (updated 4/16/2026), and fill out forms F622-035-000 and F623-021-000. Email the packet to FAS1@Lni.wa.gov and L&I sets up online payment (L&I).

Plan fees are set in WAC 296-150V-3000, which the L&I forms point to. You can also use an L&I-approved private engineer or architect to review plans, but you still pay L&I's filing fees (L&I).

Before any inspection, go through L&I's pre-inspection checklist (F622-072-000). L&I charges for the inspection even if the trailer isn't ready, and charges again for extra trips (L&I). It's cheaper to fix on paper than at inspection.

L&I contact: FAS1@Lni.wa.gov, 1-800-705-1411, Option 3.

Week 2–3: Lock in a commissary and a restroom

You can't file your county plan review without these two signed agreements. Line them up while L&I is working.

Commissary

Restroom

Week 3–4: Public Health plan review

More detail on the county side: King County health permit for food trucks: steps and 2026 fees.

Apply online in the Public Health Permit Center. You must pay the fee to finish submitting (King County). Start with the Mobile Food Unit Plan Review Guide. Incomplete plans are not accepted for review.

What goes in the package

Source: Plan Review Guide, King County plan review page.

Water details reviewers check

Source: Plan Review Guide, Appendix A.

Already permitted in another WA county? King County lets you apply by reciprocity and skip the plan review fee (King County).

Plan review questions: 206-263-7833, ehfoodandfacilitiesplan@kingcounty.gov.

Fire permit (propane, charcoal, wood, fryers)

King County's guide says fire department approval and a permit are required if you use liquid propane, charcoal, wood, or oil frying equipment (Plan Review Guide).

Selling in Seattle: the extras

Outside Seattle, other cities may need their own business license, and parking rules on public and private property differ city to city (Seattle OED). L&I also warns that some local building departments may not allow food trucks or trailers at all (L&I).

After day 30: getting to opening day

  1. Answer reviewer questions fast. Watch your email and the Permit Center. Once your plans are stamped, the reviewer emails your approval letter.
  2. Apply to operate. Use the approval letter to file the operating permit application in the Permit Center. Submit it once and wait for the emailed invoice. The operating fee is separate from the plan review fee.
  3. Pass L&I inspection. Once your L&I plans are approved, you get an inspection request form. Seattle OED says inspections average about 2–3 weeks from request (Seattle OED).
  4. Book the pre-operational inspection. Contact your plan reviewer at least 1 week ahead and send in the pre-operational checklist. Opening without this inspection can mean closure and fees, including 50% of the annual permit fee.
  5. Keep the approved plans on the trailer. Inspectors will ask to see them. Changes to the unit, menu, prep, or commissary without written approval can get you closed.

Sources: King County mobile permit page, Plan Review Guide.

Fee cheat sheet (as posted, Nov 2026)

ItemFeeSource
L&I insignia, inspection-only unit$55.10L&I
L&I plan review (plan-required unit)Per WAC 296-150V-3000WAC
King County plan review, new construction$1,008 (4-hour base) + $252/hr after2026 fee schedule
King County annual Mobile Food Unit permitRisk 1: $630 · Risk 2: $1,008 · Risk 3: $1,2602026 fee schedule
Commissary change (existing permit)$252026 fee schedule
Food worker card$10 per personKing County
WA business license, new business$50 processing + endorsementsDOR
Seattle business license (2026)$73 (under $20k) / $147 ($20k–$499,999)Seattle

Timing tip on the county permit: King County's annual permits run April 1 to March 31. If you start between January 1 and April 1, your first year is prorated to 25% of the annual fee. If you start between October 1 and January 1, it's 50% (2026 fee schedule).

Your risk category depends on your menu. The county sets it during review.

This is a guide, not legal advice. Rules and fees change. Confirm every step with L&I, Public Health – Seattle & King County, the Department of Revenue, and the city and fire department where you'll operate. L&I and the county make the final call.